Addenbrooke's Hospital – Fourth & Fifth Floors, Pathology WingProject Outline:To refurbish areas across the fourth and fifth floors of the hospital's Pathology Wing to enable the installation of new pathology equipment while allowing the wider department to remain operational.
-
Kent and Canterbury HospitalProject Outline:To refurbish an existing CT suite and associated control room within a live hospital imaging department, preparing the area for replacement imaging equipment and associated services.
-
Royal Victoria Infirmary, NewcastleProject Outline:To refurbish an existing angiography laboratory and control room, preparing the clinical environment for new specialist imaging equipment while working within the requirements applicable to a Higher-Risk Building.
-
King's College Hospital - First FloorProject Outline:To alter and adapt an existing hospital area to create two new angiography examination rooms together with the associated clinical, patient and technical accommodation. -
Stoke CDCProject Outline:To deliver the specialist environments required for a new multi-modality diagnostic imaging facility, incorporating X-ray, CT and MRI accommodation within a larger construction project. -
Andover War Memorial HospitalProject Outline:To carry out a complete refurbishment of an existing X-ray room within a live department, including changes to improve bed access and accommodate a revised equipment layout.
-
Royal Hampshire County Hospital - Second FloorProject Outline:To replace two existing mammography rooms within the department while minimising the overall period of disruption to the hospital's mammography service.
-
Princess Elizabeth Hospital, GuernseyProject Outline:To replace the existing fluoroscopy system within Fluoroscopy Room 3, while improving the layout of the space and creating a better working and patient environment. The new installation changed the orientation of the equipment and relocated electrical plant outside the main examination room.
-
St Thomas' Hospital - First FloorProject Outline:To replace an existing MRI system that had been out of service for almost 12 months, restoring an important imaging facility for patients and clinical teams as quickly and safely as possible.
-
Hammersmith HospitalProject Outline:Replacement of existing obsolete PET CT with a pet CT of the latest technology for detailed high level reserch. -
Basildon General HospitalProject Outline:Replacement of 4 existing obsolete Catheter Labs. -
Southampton General HospitalProject Outline:Installation of 2 magnetic resonance imaging (MRI) systems designed by Siemens Healthcare Systems for imaging of Neurological patients. -
LiverpoolProject Outline:A multi-modality equipment project which was originally undertaken by a previous main contractor, and which was then taken over for completion by another contractor. -
BirminghamProject Outline:Upgrade of the existing Siemens MRI scanner to a newer platform. -
HartlepoolProject Outline:Replacement of the current Siemens Healthineers MRI scanner.

Case Study
Andover War Memorial Hospital – MRI Suite
Location: Andover War Memorial Hospital
Value of Works: £1.1 Million
Tender & Design Period: 12 Weeks
Time on Site: 24 Weeks
Purpose of the Project
To deliver a new, single-storey MRI imaging suite at Andover War Memorial Hospital, providing the local community and surrounding areas with improved access to MRI services and reducing the need for patients to travel to alternative facilities.
Works Undertaken on Site
Avenue Building Company acted as Principal Contractor, delivering the complete project package including design, building works, electrical and mechanical services, RF cage installation and full site and project management.
ABC worked closely with the local authority, Building Control, Hampshire estates teams and the equipment provider throughout the project, with regular site meetings maintaining coordination, compliance and programme.
Challenges
The project was positioned directly alongside the hospital’s single main access road, requiring carefully managed traffic arrangements to maintain safe patient and visitor access throughout construction.
The existing CT imaging suite was also immediately adjacent to the works, requiring a separate patient access route for the duration of the project.
Careful coordination was essential to deliver the new facility within the agreed programme and budget while meeting the project’s compliance and future environmental requirements.