Addenbrooke's Hospital – Fourth & Fifth Floors, Pathology WingProject Outline:To refurbish areas across the fourth and fifth floors of the hospital's Pathology Wing to enable the installation of new pathology equipment while allowing the wider department to remain operational.
-
Kent and Canterbury HospitalProject Outline:To refurbish an existing CT suite and associated control room within a live hospital imaging department, preparing the area for replacement imaging equipment and associated services.
-
Royal Victoria Infirmary, NewcastleProject Outline:To refurbish an existing angiography laboratory and control room, preparing the clinical environment for new specialist imaging equipment while working within the requirements applicable to a Higher-Risk Building.
-
King's College Hospital - First FloorProject Outline:To alter and adapt an existing hospital area to create two new angiography examination rooms together with the associated clinical, patient and technical accommodation. -
Andover War Memorial HospitalProject Outline:To carry out a complete refurbishment of an existing X-ray room within a live department, including changes to improve bed access and accommodate a revised equipment layout.
-
Royal Hampshire County Hospital - Second FloorProject Outline:To replace two existing mammography rooms within the department while minimising the overall period of disruption to the hospital's mammography service.
-
Princess Elizabeth Hospital, GuernseyProject Outline:To replace the existing fluoroscopy system within Fluoroscopy Room 3, while improving the layout of the space and creating a better working and patient environment. The new installation changed the orientation of the equipment and relocated electrical plant outside the main examination room.
-
St Thomas' Hospital - First FloorProject Outline:To replace an existing MRI system that had been out of service for almost 12 months, restoring an important imaging facility for patients and clinical teams as quickly and safely as possible.
-
Andover War Memorial HospitalProject Outline:To deliver a new, single-storey MRI imaging suite at Andover War Memorial Hospital, providing the local community and surrounding areas with improved access to MRI services and reducing the need for patients to travel to alternative facilities. -
Hammersmith HospitalProject Outline:Replacement of existing obsolete PET CT with a pet CT of the latest technology for detailed high level reserch. -
Basildon General HospitalProject Outline:Replacement of 4 existing obsolete Catheter Labs. -
Southampton General HospitalProject Outline:Installation of 2 magnetic resonance imaging (MRI) systems designed by Siemens Healthcare Systems for imaging of Neurological patients. -
LiverpoolProject Outline:A multi-modality equipment project which was originally undertaken by a previous main contractor, and which was then taken over for completion by another contractor. -
BirminghamProject Outline:Upgrade of the existing Siemens MRI scanner to a newer platform. -
HartlepoolProject Outline:Replacement of the current Siemens Healthineers MRI scanner.

Case Study
Stoke CDC – Diagnostic Imaging Suites
Location: Stoke CDC
Value of Works: £1.4 million
Tender & Design Period: 15 Weeks
Time on Site: 28 Weeks
Purpose of the Project
To deliver the specialist environments required for a new multi-modality diagnostic imaging facility, incorporating X-ray, CT and MRI accommodation within a larger construction project.
Works Undertaken on Site
ABC delivered X-ray protection, mechanical and electrical services and finishes to two X-ray rooms and two CT examination rooms, together with their associated control areas.
Two RF cabins were installed for the new MRI areas, alongside the required mechanical and electrical systems, finishes, control rooms and technical rooms.
ABC also developed the M&E design package in collaboration with the NHS, ensuring the specialist imaging installations integrated correctly with the main contractor’s wider building services design.
Challenges
ABC was appointed by the equipment supplier on a turnkey basis and was required to operate within a larger construction site under the health and safety procedures of the Principal Contractor.
Close coordination between ABC, the main contractor, equipment supplier, NHS and wider design team was therefore essential to ensure all specialist systems integrated correctly.
A dedicated ABC Site Manager, supported by an office-based Project Manager, oversaw the works. Regular programme meetings, client coordination meetings and fortnightly project reports ensured progress and emerging issues remained clearly managed throughout.
All areas were completed ready for delivery and installation of the imaging equipment.