Addenbrooke's Hospital – Fourth & Fifth Floors, Pathology WingProject Outline:To refurbish areas across the fourth and fifth floors of the hospital's Pathology Wing to enable the installation of new pathology equipment while allowing the wider department to remain operational.
-
Kent and Canterbury HospitalProject Outline:To refurbish an existing CT suite and associated control room within a live hospital imaging department, preparing the area for replacement imaging equipment and associated services.
-
Royal Victoria Infirmary, NewcastleProject Outline:To refurbish an existing angiography laboratory and control room, preparing the clinical environment for new specialist imaging equipment while working within the requirements applicable to a Higher-Risk Building.
-
Stoke CDCProject Outline:To deliver the specialist environments required for a new multi-modality diagnostic imaging facility, incorporating X-ray, CT and MRI accommodation within a larger construction project. -
Andover War Memorial HospitalProject Outline:To carry out a complete refurbishment of an existing X-ray room within a live department, including changes to improve bed access and accommodate a revised equipment layout.
-
Royal Hampshire County Hospital - Second FloorProject Outline:To replace two existing mammography rooms within the department while minimising the overall period of disruption to the hospital's mammography service.
-
Princess Elizabeth Hospital, GuernseyProject Outline:To replace the existing fluoroscopy system within Fluoroscopy Room 3, while improving the layout of the space and creating a better working and patient environment. The new installation changed the orientation of the equipment and relocated electrical plant outside the main examination room.
-
St Thomas' Hospital - First FloorProject Outline:To replace an existing MRI system that had been out of service for almost 12 months, restoring an important imaging facility for patients and clinical teams as quickly and safely as possible.
-
Andover War Memorial HospitalProject Outline:To deliver a new, single-storey MRI imaging suite at Andover War Memorial Hospital, providing the local community and surrounding areas with improved access to MRI services and reducing the need for patients to travel to alternative facilities. -
Hammersmith HospitalProject Outline:Replacement of existing obsolete PET CT with a pet CT of the latest technology for detailed high level reserch. -
Basildon General HospitalProject Outline:Replacement of 4 existing obsolete Catheter Labs. -
Southampton General HospitalProject Outline:Installation of 2 magnetic resonance imaging (MRI) systems designed by Siemens Healthcare Systems for imaging of Neurological patients. -
LiverpoolProject Outline:A multi-modality equipment project which was originally undertaken by a previous main contractor, and which was then taken over for completion by another contractor. -
BirminghamProject Outline:Upgrade of the existing Siemens MRI scanner to a newer platform. -
HartlepoolProject Outline:Replacement of the current Siemens Healthineers MRI scanner.

Case Study
King’s College Hospital – Angiography Suites
Location: King's College Hospital - First Floor
Value of Works: £1.3 million
Time on Site: 32 weeks
Purpose of the Project
To alter and adapt an existing hospital area to create two new angiography examination rooms together with the associated clinical, patient and technical accommodation.
The completed facility included WC and changing facilities, dirty utility and scrub-up areas, UPS rooms and technical rooms supporting the imaging equipment.
Works Undertaken on Site
ABC delivered the required X-ray protection, mechanical and electrical services and internal finishes throughout the new facility.
A significant structural package was also required after it was established that the existing floors could not support the loads imposed by the new imaging equipment and X-ray protection.
ABC therefore designed and installed the necessary structural support works, alongside developing an M&E package capable of integrating with the hospital’s existing services.
Challenges
The project was undertaken within a live imaging department on the first floor, immediately above an operational A&E department.
Installation of the structural support required access into A&E areas below. These works were carefully programmed out of hours, including nights and weekends, with planned temporary closures allowing the work to take place while maintaining the wider operation of the department.
Daily site communication ensured ABC teams and NHS staff remained aware of activities taking place around the project.
The completed areas were handed over ready for equipment installation, supported by full operation and maintenance documentation and witnessing with the relevant hospital engineers.